SEG has a strong network with additional quality architectural and
engineering firms which enable us to provide a complete plan and
specification package ready for bid and/or construction. Below is a partial sample of our
client feedback.
|
 |
| |
Portfolio of Projects |
| |
|
| |
SEG’s key members have more
than 35 years of experience in the public and private sectors with
contributions to the high-profile projects listed on this page. |
 |
| |
Land Development |
| |
|
| |
•
Mountain Vista Marketplace, Mesa, AZ, 114-Acre Mixed-Use project:
- Project includes 20 acre of Multifamily complex, two major hotels,
700,000 Sq. Ft. of lease area (Super Target, Marshalls, Dicks, etc.),
- Oversee site planning and entitlement process, platting process,
full engineering construction documents and annexation process.
- Be the point of contact with sub consultants, City of Mesa, ADOT,
MCDOT, MCESD, WAPA, SouthWest gas and SRP
- Prepare city share and public bid package for public street
improvements.
- Leading dry utility coordination.
- Manage construction budget and review change orders on behalf of
client as necessary.
- Construction administration.
• City of Chandler - Chuparosa Park Phase II Design/Build -
Chandler, AZ- 12-acres of development on existing park includes new
lake system, site lighting, extensive landscaping, new parking,
pathways, and shade structures - $1.1 million.
• Central Arizona College - Police Driver Training Course
Design/Build - Coolidge, AZ - 100 acre site for police vehicle
training skid pad includes 20,000 CY of mass grading, paving,
drainage work and a culvert - $430,000.
|
 |
| |
Transportation |
| |
|
| |
•
I-17 Expansion from Thomas Road to Camelback Road Drainage (with
DMJM) – Relocated existing freeway catch basins and reconnect new
catch basins to existing storm drain system in the medium of
freeway.
• US-60 Expansion from Cave Creek Road to Morrison Town (with Dibble
& Associates). Prepare drainage plans (storm drain and catch basins)
for the medium drainage and cross road drainages.
• City of Mesa – Signal Butte road
improvement: road widening, utilities, decorative walls,
landscaping, underground water, sewer and storm drain, dry
utilities, grading and paving, striping, curb and gutter.
• City of Mesa – Hampton Avenue: new
road, utilities, decorative walls, landscaping, underground water,
sewer and storm drain, dry utilities, grading and paving, striping,
curb and gutter.
• City of Mesa – Cheshire road
improvement: road widening, utilities, decorative walls,
landscaping, underground water, sewer and storm drain, dry
utilities, grading and paving, striping, curb and gutter.
• MCDOT - McDowell Road Reconstruction - Pima Freeway to Alma School
- Mesa, AZ - 2 miles of new roadway and utilities includes
decorative walls, landscaping, underground water, sewer and storm
drain, dry utilities, grading and paving, striping, curb and gutter
- $4.8 million.
• MCDOT - Southern Avenue improvement - Cheshire to Signal Butte
Road - Mesa, AZ 0 to 1 miles of new roadway lanes and utilities
includes decorative walls, landscaping, underground water, sewer and
storm drain, dry utilities, grading and paving, striping, curb and
gutter.
CMAR Association:
• Coconino County - Pinewood Boulevard Munds Park
CMAR - Flagstaff, AZ: Storm sewer, grading for future pedestrian
path, safety and other drainage improvements - $1.8 million
• City of Chandler - Germann Road Improvements,
Dobson to Arizona Avenue CMAR - improvements to the roadway will
widen Germann Road with three traffic lanes for both eastbound and
westbound traffic and construct raised landscaped medians, bike
lanes, storm drainage, underground SRP irrigation facilities, street
lights, traffic signal modifications, domestic water lines and
reclaimed water lines - $7.7 million.
• City of Gilbert - Pecos Road Reconstruction Phase
I CMAR - underground water, sewer, dry utilities, grading, paving,
landscaping, curb and gutter, traffic signals - $8.5 million.
• City of Gilbert - Pecos Road Reconstruction Phase
II CMAR - underground water, sewer, dry utilities, grading, paving,
landscaping, curb and gutter, traffic signals - $6.77 million. |
 |
| |
Hospitals |
| |
|
|
•
Oakwood Hospital, Dearborn, MI:
- 2.5 acre emergency parking addition
- Prepare full engineering construction documents
- Dry utilities coordination
- Layout fiber optic lines and coordinate conflict
- Physical site surveys prior to construction and final design to
assure the accuracy of the survey in order to avoid any utility
disconnection to the hospital.
- detailed cost estimate
- Review as built drawings
• Mount Clemens General Hospital, Mount Clemens,
MI:
- 46,092 sq.ft. cancer center building.
- Generate full engineering construction documents
- Layout fiber optic lines and coordinate conflict
- Coordinate grades for future pedestrian bridge connecting between
existing building and the proposed cancer center building.
- Design storm water treatment systems prior to discharging to the
Clinton River.
- Review as built drawings.
• Henry Ford Hospital, Wyandotte, MI:
- MRI building addition and expansion of existing emergency parking
- prepare full engineering construction documents
- Incorporate emergency entrances to satisfy hospital loading and
unloading patient activities.
- Remove existing pedestrian bridge and provide a safely path for
patient around entrances. |
 |
| |
Water and Wastewater |
| |
|
| |
•
Stormwater Management and Hydrologic Studies
- Mountain Vista Marketplace, Mesa, Arizona. Prepared Master Drainage Report for the 114-acres commercial development. Designed storm drain, water, sewer, and storm water management system.
• Various commercial and residential developments in the cities of Phoenix, Peoria, Glendale, Mesa, and Goodyear. Prepared drainage reports, storm drains, water, sewer, and storm water management systems
• Salt River Project, Rio Salado Salt River Re-Channelization for Gravel Mining, Phoenix, AZ.
Wastewater Treatment and Reuse:
• Pima County. Avra Valley Wastewater Treatment Facility 4.0 MGD Expansion, Pima County, AZ: upgrade and expansion to the Avra Valley Wastewater Treatment BNROD Facility.
• Centex Homes, Palo Verde Road Wastewater Treatment Plant Expansion (Phase 2), Buckeye, AZ: design of a wastewater treatment plant expansion from 1.0 MGD to a 2.0 MGD. Utilizing a biological treatment process consisting of sequencing batch reactors for the 2.0 mgd expansion.
• Fairfield Homes, Cielo Wastewater Treatment Plant Design, Pinal County, AZ: design of a 650,000 gpd wastewater treatment plant for the Rancho Coronado Project. The wastewater treatment plant is designed with tertiary filtration and ultra-violet (UV) disinfection, and an influent and effluent pump station. The design was based on Smith & Loveless biological treatment equipment with removable aluminum covers.
• City of Coolidge, Wastewater Treatment Plant Planning and Phase I Expansion, Coolidge, AZ: planning and layout of a new 32 MGD wastewater treatment plant.
• Town of Taylor, New Membrane Biological Reaction (MBR) Wastewater Treatment Plant,, Taylor, AZ: modifications of the existing offsite sewage pump station, new 0.1 MBR package plant, equalization basin, equalization basin pump station, effluent chlorination/dechlorination, plant water system, sludge pump station, and sludge drying beds.
• Pima County Wastewater Management, Marana Wastewater Treatment Plant, Marana, AZ: design of the Marana wastewater treatment plant that uses biological nutrients removal (BNR) process to reduce the total effluent nitrogen to less than 8 mg/L.
• City of Benson, Benson Wastewater Treatment Plant, Benson, AZ: Design influent pump station, headworks with aerated grit chambers and automatic bar screens, grit pump station, grit drying beds, dual oxidation ditch, secondary clarifiers, automatic backwash filters, UV disinfection system, effluent holding ponds, effluent pump station, RAS/WAS pump station, sludge holding tanks/aerated sludge digester, sludge pump station, sludge drying beds, yard piping, emergency overflow basin, influent and effluent metering, chlorination and dechlorination pump stations as the UV-backup system, chemical storage facilities, service water pump station and service water system, site grading, paving, and drainage. Included the completion of construction documents and the Operation and Maintenance Manual.
• Pima County Wastewater Management, Ina Road Wastewater Treatment Plant Expansion and Process Change, Tucson, AZ: design of the 75 mgd influent pump station that has four 102-inch diameter screw pumps. Designed the influent and effluent metering facility, each of which has a 120-inch wide Parshall Flume with an 84-inch Parshall Flume insert. Designed the 25 mgd primary clarifier, primary sludge pump station, and scum pump station, and the 25 mgd chlorine contact basin. Project also included conversion of one existing gravity sludge thickener to DAFT and redesign the existing pressurization pump station and piping.
• Safford Federal Penitentiary, Wastewater Treatment Plant Expansion Safford, AZ: expansion of the wastewater treatment capacity to 0.5 mgd. The design included new evaporation ponds with sufficient surface aerators for odor control and yard piping.
• City of Phoenix, 23rd Avenue Wastewater Treatment Plant Expansion, City of Phoenix, AZ: Designed the 40 mgd RAS pump station, 10 mgd plant water pump station, 75 mgd MLSS recycle pump station, 10 mgd aeration basin dewatering pump station, 24,000 PPD chlorine injector station, 8,000 PPD sulfur dioxide injector station, chlorine residual sampling and analysis system and control.
• Florence State Prison, Eyman Phase IA/IB Wastewater Treatment Plant, State Prison, Florence, AZ: Designed the influent pump station, equalization basin, equalization basin pump station, RAS/WAS pump stations, reuse water pump station, plant water pump station and yard piping. Performed the plant hydraulic analysis. Also, prepared the Operation and Maintenance Manual.
• City of Phoenix, Lift Stations, Containment Capability and Stand-by Power Study, Phoenix, AZ: Investigated the pumping capacity, structural integrity, and the power supply system of fifteen existing lift stations for the City of Phoenix and evaluated the time it would take for the raw sewage to overflow the most downstream manhole of the lift stations when all the power of the pumps were all to fail at the same time.
• East Bay Municipal Utilities District, Oakland Main Wastewater Treatment Plant Operation and Maintenance Manual, Oakland, CA: Prepared the Operation and Maintenance Manual (O&M) for the 350 mgd influent pump station.
• Moqui Lodge, Wastewater Treatment and Disposal Study, Tusayan, AZ: Performed a study on the existing wastewater treatment and disposal capability of four existing evaporation ponds. Presented an economic and non-economic analysis of different feasible solutions to solve the existing wastewater disposal problem.
• UDC Homes, Gold Canyon Ranch Master Sewer Plan, Gold Canyon Ranch, AZ: Prepared the Master Sewer Plan for Gold Canyon Resort that included analyzed present and future population projections and sewage flow projections, designed main sewer line, and site location of future wastewater treatment plant.
Water Treatment Plant Design:
• City of Phoenix, Val Vista Water Treatment Plant 34-Ton Chlorine Trailers Conversion to Thirty-two 1-Ton Chlorine Cylinders, Phoenix, AZ: conversion of a two 17-ton chlorine trailer feeding system to four banks of eight 1-ton chlorine cylinders. new four banks of eight 1-ton chlorine cylinder layouts with automatic shut off valve actuators, chlorine header valves and manifold, monorail system, control, and structural modification of the building.
• City of Phoenix, Water Reservoir Chlorine Residual Study, Phoenix, AZ: Investigated eleven existing water reservoirs and chlorine booster stations for the City of Phoenix. Designed chlorine residual booster pump station, water recirculation pump station and chlorination control for the water reservoir to booster the chlorine residual above 2 mg/L.
• City of Phoenix, Verde Water Treatment Water Operation and Maintenance Manual, Phoenix, AZ: Prepared the Operations & Maintenance Manual for the raw water inlet structure, sedimentation basins, and influent pump station for the Verde Water Treatment Plant.
• City of Phoenix, Deer Valley Water Treatment Water Operation and Maintenance Manual, Phoenix, AZ: Prepared the Operation and Maintenance Manual for the sedimentation basin, clear water pump station and chemical storage facilities for the Deer Valley Water Treatment Plant. |
 |
|
 |
 |
 |

 |
 |
 |
 |
| |
Sustainability Engineering
Group, LLC.
info@azSEG.com
(480) 516-5514
28028 N 110th Place
Scottsdale, AZ 85262 |
| |
|
|
|
 |
 |
Current Projects |
| |
|
| |
Our team provides invaluable expertise on the latest criteria for
your Sustainable projects, designs and operations. Many key members of our Team are LEEDŽ Accredited Professionals and actively participate in both local and national organizations. We value the relationships we have built with our clients and welcome the opportunity to continue providing the highest level of service on future projects. Our approach embeds sustainable principles within development proposals throughout the process – from site selection to operation and management as outlined on this page.
Here is a list of our current projects:
Tiger Wash and Eagle Eye Road Crossing Hydrologic and Hydraulic Studies MCDOT,
Maricopa County, AZ: Tiger Wash and Eagle Eye Road are located near the northwest of Maricopa County limit. The crossing is often flooded during a severe storm. Maricopa County Department of Transportation (MCDOT) closed the road crossing during storms. After the storm, the MCDOT highway maintenance crew dewatered, and cleaned the road surface before the road is reopened to the public. MCDOT contracted Sustainability Engineering Group (SEG) and Parson Brinkerhoff to find out the best alternatives to solve the existing flooding problem. The watershed of this study consists of 160 square mile and is mainly natural mountain reserve. SEG worked closely with the flood control district engineer and MCDOT engineering division to finalize hydrology technical parameters. SEG prepared a Drainage Concept Report for Tiger Wash using field reviews, existing mapping, and other data that were available according to the latest versions (draft or effective) of the Maricopa County Drainage Policies and Standards manual and the Drainage Design Manuals for Maricopa County. The design discharge magnitudes for the 10, 50 and 100-year storm events were determined for wash crossing location. The Drainage Concept Report included analysis of the 6-hour and 24-hour design storms. The hydraulic analysis evaluated hydraulic grade, energy grade, critical depth, flow regimes, culvert flow control, headwater,
tail water, roadway overtopping, scour, sedimentation, and erosion protection measures for the Eagle Eye Road and Tiger Wash crossing.
The hydrologic and hydraulic studies have been performed using HEC-1
and HEC-RAS computer program. DDMSW computer problem is used to
prepare the HEC-1 data input file.
Shepherd of the Valley Development, Surprise, AZ: Full project management, architectural construction documents, planning and entitlement process, building permit acquisition and engineering design services for an approximately 2,500sf building expansion and remodel to an existing church building located in Surprise, AZ on approximately 4 acres.
Conducted a hydrology investigation to determine storm water flows within the exiting 4 acres site and upgrade drainage to meet latest city of Surprise standards.
Prepared a final drainage report and drainage plan based upon the approved Site Plan. The drainage report included hydrologic and hydraulic calculations in accordance with the applicable criteria and prepared grading plan and the storm sewer system construction plans based upon the final drainage design as required. Tyler Residence, Scottsdale, AZ: The project is a residential property located in Rio Verde area Scottsdale under Maricopa County jurisdiction.
Provided project management and site grading and drainage for the existing site area based upon processing requirement for the Maricopa County and flood control district. The Rio Verde has been analyzed using Flo2d, SEG worked closely with the flood control district and Maricopa county development department to revise flow and water surface elevation within the subject site.
Performed the hydrologic and hydraulic studies using HEC-1 and HEC-RAS computer program. Stephan II Condominium Development, Phoenix, AZ:
Parcel acreage is approximately 2.42 acres. The proposed project include a Multifamily residence
building, all associated parking; landscaping; drive isles; service areas; and other such requirements. SEG performed
site engineering for the entire project based upon the processing requirement for the city.
Prepared a final drainage report and drainage plan based upon the approved Site Plan. The drainage report included hydrologic and hydraulic calculations in accordance with the applicable criteria and prepared grading plan and the storm sewer system construction plans based upon the final drainage design as required.
Managed and prepared a Condominium subdivision Final re-plat of the entire project based upon processing requirement for the City of Phoenix, the Maricopa County and the AZ
Department of Real Estate. Kirkpatrick Residence, Maricopa County, AZ: This residential property
is located in Mesa under Maricopa County jurisdiction. SEG provided site grading and drainage for the project area (4.74 acres) based upon processing requirements.
Performed utilities design, pool grading, putting and chipping design and grading, hydraulic and hydrology analysis. The watershed contributing to the existing wash adjacent to the proposed residence is of 64 acres and is mainly natural mountain reserve. SEG hydrologic and hydraulic studies
were performed using HEC-1 and HEC-RAS computer program. DDMSW computer program is used to prepare the HEC-1 data input file. Speedsmart Fuel Facility and MCDOT Construction Inspection, Buckeye, AZ: This
is a 4 acres fuel facility development with major roadway improvement located within town of Buckeye at the SE corner of Miller and Durango.
Provided full construction administration for the subject not limited to: meetings, respond to RFI, site inspection as required, coordinate construction schedule, special inspection, submittals and shops drawings review, as built review, cost estimating and draw request review.
Prepared construction documents for Hess Lane improvement and performed all inspection and phase certification required by MCDOT. Hess Lane is under the jurisdiction of Maricopa county. Wild Horse Casino (Shelde Building Expansion), Chandler, AZ: The project is a proposed building addition of 3,875sf and the total disturbed site area is less than one acre. SEG provided
preliminary planning, entitlement, site engineering services for the area disturbed by the building addition based. The site accommodates a 7,655 square foot Shelde building; a 2,980sf back patio; landscaping; drive isles; service areas; and other such requirements. Palm Valley Marketplace, Goodyear, AZ:
managed architectural construction documents, TI and building permit services based upon processing requirements for the
city. Project consists of an approximately 3,500 square foot interior tenant remodel in the Palm Valley Marketplace located at the SW corner of Indian School Rd. and Litchfield Blvd. Superstition Springs Center Eye Stop Optical, Mesa, AZ: managed retail build-out, architectural construction documents and building permit acquisition for an interior remodel of an existing 693sf retail tenant space. The project included
three new offices, new storefront, placement and coordination of
owner supplied equipment. Go Go Yogurt, Phoenix, AZ: managed retail TI's, architectural construction documents and building permit acquisition services for the interior remodel of an existing 1,500sf restaurant. Finished retail restaurant build-out. Project included placement of owner supplied equipment and furnishings.
|
 |
|
Recommendations |
| |
|
| |
"I would offer my highest recommendation for Ali
on any project. ... his willingness to confer with construction
manager, contractor and owner prior to producing documentation
assisted in achieving the most cost effect design and schedule."
- Gerald Smith, Construction Manager Mount
Clemens Regional Medical Center (Click
to View Letter)
“... have been witness to his professionalism and experience in
connection with a large retail development that included complex
engineering and multi-governmental challenges. His ability to
understand, reason and provide solutions is of the highest
caliber...” - Mike Clements, MVC Real Estate
Services, LLC (Click
to View Letter)
"We worked together on various site development projects that
had LEED and sustainability goals in them... Mr. Fakih is a
comprehensive engineer capable of sustaining the goals of a project
to the optimal conclusion." - Richard G Hinson, P.E.
Technologists Inc. (Click
to View Letter)
"Ali served as the civil engineer of record for the
development. The mixed use development totaled 120 acres of retail,
apartment, hotel and office uses along with rehabilitating two miles
of County and City streets." - Timothy P. White, ASPE, CSI, CDT
DeBartolo Development (Click
to View Letter )
“In the fall of 2008 while attending a Real Estate Conference in
Scottsdale I had the opportunity to meet Ali Fakih. He was the
guest speaker and panel moderator for a discussion on 'Mixed Use
Challenges'. Ali and his group were most helpful and enlightening
into the current challenges our economy is facing. He offered many
solutions.” - S.Keiger, Economic Development Group of Eloy
|
 |
| |
Retail |
| |
|
| |
•
Super Target
Mesa AZ : 172,000 Sq. Ft. building:
- conduct full planning / entitlement submittal
- generate full engineering construction documents
• Rite Aid
Numerous locations in MI:
- preparation of due diligence package
- generate full engineering construction documents
• Lowe’s
Numerous location in CA:
- generate full engineering construction documents
- Implement storm water management plan by using bio-swale to assure
water treatment development.
• Albertsons
Numerous locations in CA, MI, and OH:
- Coordinate site design for building additions
- Generate construction phasing plans
- Provide conceptual cost estimate for new site and establishing a
full site issue investigation.
• Save On
Numerous locations in CA, MI, and OH:
- Coordinate site design for building additions
- Generate construction phasing plans
- Provide conceptual cost estimate for new site and establishing a
full site issue investigation.
|
 |
| |
Gas Stations |
| |
|
| |
•
Giant Eagle
Numerous locations in OH and PA:
- Prepare full construction documents for gas station sites
- Generate fuel piping layouts (Stage II and Non-Stage II), and
establish fuel equipment and part lists.
• Kroger
Numerous locations in MI and OH:
- Prepare full construction documents for gas station sites.
- Generate fuel piping layouts (Stage II and Non-Stage II), and
establish fuel equipment and part lists.
- Construction administration.
|


|
|